PHASES OF THE BUILD

  • 1-2 MONTHS

    • Plans

    • Engineering Permit

    • Lot Grade and Prep

    • Soil Test

    • Pour Footers

    • Build Foundation

    • Foundation Survey

  • 3-4 MONTHS

    • Framing

    • HVAC Rough

    • Plumbing Rough

    • Electrical Rough

    • Framing Inspection

    • Rough Trade Inspections

    • Insulation .

    • Drywall

    • Selections (Lighting etc)

  • 1-2 MONTHS

    • Interior Trim and Doors

    • Siding

    • Paint

    • Cabinets

    • Driveway Install

    • Hvac Final

    • Plumbing Final

    • Electrical Final

  • 1 MONTH

    • Landscaping

    • Fence

    • Punch List

    • Final Building Inspection

    • Certificate of Occupancy