PHASES OF THE BUILD
-
1-2 MONTHS
Plans
Engineering Permit
Lot Grade and Prep
Soil Test
Pour Footers
Build Foundation
Foundation Survey
-
3-4 MONTHS
Framing
HVAC Rough
Plumbing Rough
Electrical Rough
Framing Inspection
Rough Trade Inspections
Insulation .
Drywall
Selections (Lighting etc)
-
1-2 MONTHS
Interior Trim and Doors
Siding
Paint
Cabinets
Driveway Install
Hvac Final
Plumbing Final
Electrical Final
-
1 MONTH
Landscaping
Fence
Punch List
Final Building Inspection
Certificate of Occupancy